Supply of PLC & Control system works Station (Advanced) Vocational Training Equipment Electrical Lab Equipment

Supply of PLC & Control system works Station (Advanced) Vocational Training Equipment Electrical Lab Equipment

TB-211009-S-01 Supply of PLC & Control system works Station (Advanced) Vocational Training Equipment Electrical Lab Equipment for college, vocational training center, university. 

  • Description
  • Inquiry

TB-211009-S-01 Supply of PLC & Control system works Station (Advanced) Vocational Training Equipment Electrical Lab Equipment

  1. All components must secure properly on the work station as per drawing and instruction.
    II. All electrical measuring equipment must properly installed so that all measurable parameter can be taken easily.
    III. All components must connect with safety laboratory cable option to connect easily without having any human body interaction to avoid electric shock.

    Table size (Min): L45 Inch X Width 25 Inch X Height 65 Inch.
    PLC brand: Siemens S7-Intrmediate and midrange controller
    This workstation is suitable for learning advance level training PLC programming, more input output handling & process, Visualization, communication, data storing, management and supervisory control & data accusation (SCADA).

    The work-station must include the following components
    (1) 1 × S7-1200 CPU with built-in 14 DI/10DO/2AI.
    (2) 1 × 2 Channel analogue output module.
    (3) 1 × 2 Channel PT100 module.
    (4) 1 × 8 Digital IO expansion module.
    (5) 1 × 2 Channel Thermo couple module.
    (6) 1 × 2 Channel 4-20 ma modules.
    (7) 1 × Siemens 4″ color HMI.
    (8) 2 × Double acting cylinder.
    (9) 2 × 5/2 Single coil solenoid valve.
    (10) 2 × Multi turn variable potentiometer.
    (11) 1 × 1 to 5 v/4-20 ma pressure sensor.
    (12) 4 × Panel meter.
    (13) 1 × PT100 sensor.
    (14) 1 × Thermo couple.
    (15) 1 × 0.5 Kw VFD (Siemens).
    (16) 1 × 3 phase induction motor 0.5 kw.
    (17) 50 × Safety laboratory cable.
    (18) 1 x 24 volt supply.
    (19) 1 × Desktop Computer (Brand PC), Processor: Minimum Core i5 (8th Gen), RAM: 8 GB, Operating System: Windows 10
    (20) Multi-plug.
    (21) Assembly of the work station
    (22) Wiring of the work- station
    (23) Testing & commission of the work-station
    Additional condition:
    (a) All equipment mentioned above must in operation as required as a PLC work-station. To make the system fully operation if additional component is required supplier must provide those equipment to make the work station fully operational.

(b) All required cable, connector, soldering, cable tray must supply as required by the station

(c) All electrical connection must be covered properly to body contact.

(d) The work-station must easily transferable from one place another with wheel.

(e) All individual components must have identification number and name properly to understand by the trainees.

(f) The work-station must silver aluminum frame body.

(g) All assembly component need to sully along with the work-station

(h) All assembly, wiring, installation, testing, commissioning must include in the quoted price.

(i) Must manufactured in Bangladesh as per specifications & instructions.

We will contact you within 1 working day, please pay attention to the email.